Pillar-mounted slewing jib crane BETA 500

WLL: 50 - 125 kg
Outreach: 1 - 5 m

BETA-100-icon.png

Pillar-mounted slewing jib crane BETA 500

  • Slewing range: 270°
  • Rotation: manual
  • Chain hoist: electric or manual
  • Trolley: manual
  • Control from the attached cassette  to hoist or separately

Pillar-mounted slewing jib crane.jpg
Outreach
[m]:
WLL
[kg]: 
50   *  *  *  *  *
80   *  *  *  *  
125   *  *  *  


Recommended equipment. Optional:

  • hoist ENW with hand trolley WS
  • hoist EVW with hand trolley WS
  • hoist VX with hand trolley WS
  • hoist SBE with hand trolley  WS
  • hoist Balanser



ENW EVW

VX

wciagnik lancuchowy EVW.jpg

wciagnik lancuchowy elektryczny VX.jpg

SHOW

SHOW

SHOW


SBE


Balanser



wciagnik lancuchowy elektryczny VX.jpg

SHOW

A trolley and cable trolleys compatible with popular monorail suspended track systems.

kaseta sterujaca 1.jpg

kaseta sterujaca 2.jpg


Control:

cassette control ST

cassette control SE

kaseta sterujaca 1.jpg

kaseta sterujaca 2.jpg

control with a manipulator SM control cylindrical SC

kaseta sterujaca 3.jpg

kaseta sterujaca 4.jpg

radio control SR

Arm rotation drive:

  • SP arm rotation retarder

AMK BETA 200 ż v08a from low res M200508.png


Working area limitation:

  • SB arm rotation lock 
  • SO arm rotation limiter adjustablet (option)
  • SO arm rotation limiter permanent (as standard)


Floor fixing of pillar jib cranes:

Basic recommended methods of foundation of BETA series pillar cranes:

  • fixing with anchors on a reinforced foundation
  • fastened to the concrete floor through a steel intermediate plate on chemical anchors.

mocowanie do posadzki.jpg

Fastening to the concrete floor via steel intermediate plate on chemical anchors

Reinforced foundation with anchors

Product Details

6035

Download

Catalog miproCrane Mipromet

Download (14.68M)

Product Comments

Comments (0)